GN Solids Control Double‑Deck Shale Shaker Delivered for Deep Well Drilling Project

GN Solids Control has completed shipment of double‑deck Shale Shaker units to support a large‑scale deep well drilling operation. The equipment left the manufacturing facility on 12 August 2026 and will serve as primary first‑stage separation equipment within the on‑site mud purification process, addressing the demanding solids removal requirements generated during deep formation penetration.
A large batch of drilling fluid processing equipment has been completed and dispatched from GN Solids Control manufacturing base, with multiple sets of 


